Project description
before the House is coming;
1. Removing the pile of Brash
2. Raising by 1 ft. the Driveway, Parking area and the House location
3. Building A 30'x42' Slab Per Town Specs
4. Building A Septic System Per Plan
After the House is in;
5. Final grading of the property
6. 5’ of Topsoil in all clean area
7. Finish with item four the driveway and parking