Project description

 before the House is coming;

1. Removing the pile of Brash

2. Raising by 1 ft. the Driveway, Parking area and the House location

3. Building A 30'x42' Slab Per Town Specs

4. Building A Septic System Per Plan

After the House is in;

5. Final grading of the property

6. 5’ of Topsoil in all clean area

7. Finish with item four the driveway and parking